Join Contact

Check Andhra Pradesh PM Surya Ghar Muft Bijli Yojana Benefits Online: Here’s the Process

Residents of Andhra Pradesh can check their PM Surya Ghar Muft Bijli Yojana benefits online through the national rooftop solar portal. The scheme provides subsidies for rooftop solar installations, with progress monitored by NREDCAP and local DISCOMs.

Published On:

Residents of Andhra Pradesh can now easily verify their entitlements under the PM Surya Ghar Muft Bijli Yojana using online platforms. The national scheme, which provides up to 300 units of free electricity through rooftop solar systems, is implemented in the state through the New and Renewable Energy Development Corporation of Andhra Pradesh (NREDCAP). Here is a detailed look at how beneficiaries can check their subsidy and benefit status online.

Andhra Pradesh PM Surya Ghar Muft Bijli Yojana
Andhra Pradesh PM Surya Ghar Muft Bijli Yojana

The PM Surya Ghar Muft Bijli Yojana represents a significant opportunity for Andhra Pradesh households to reduce energy costs and contribute to renewable energy targets. By using the national portal and support from NREDCAP, citizens can track their applications and ensure they receive timely benefits under the programme.

Understanding the Scheme

The PM Surya Ghar Muft Bijli Yojana was launched in 2024 to promote rooftop solar adoption across India. Eligible households receive central financial assistance (CFA) for installation, capped at ₹78,000 per system. In Andhra Pradesh, applications and verifications are handled jointly by the national portal and state nodal agencies.

According to the Ministry of New and Renewable Energy (MNRE), the scheme covers only residential connections, with the subsidy linked directly to system capacity and installation compliance.

Check Benefits Online

Visit the Official Portal

Go to the National Rooftop Solar Portal and select Andhra Pradesh as your state. This portal provides tracking facilities for registration, subsidy, and net metering.

Login or Register

Applicants must log in using their credentials. New users need to register with Aadhaar, mobile number, and electricity service connection details.

Access “Track Application”

After logging in, navigate to the “Track Application Status” option. Enter your application or registration number to retrieve updates.

Review Current Status

The portal displays the progress stage — pending approval, feasibility check, vendor allocation, installation, inspection, or subsidy disbursal.

Contact NREDCAP if Needed

If applications face delays or discrepancies, citizens may contact NREDCAP, the state’s nodal agency, for resolution.

What Information Can Be Checked

Through the online system, users can verify:

  • Eligibility confirmation for subsidies
  • Approval or rejection of application
  • Installation and commissioning status of rooftop solar units
  • Financial assistance disbursal under the scheme
  • Net metering updates from electricity distribution companies

Related Links

Register for Ayushman Bharat Digital Mission Online: Check Application Process

Apply for PM Vishwakarma Kaushal Samman Scheme Online: Step-by-Step Guide

Register for GEM Government e-Marketplace Portal: Complete Guide for Sellers

Andhra Pradesh Implementation

In Andhra Pradesh, implementation is overseen by NREDCAP, in coordination with state distribution companies. The process requires feasibility approval before installation, vendor selection from an approved list, and final inspection by authorities. Only systems installed through registered vendors qualify for subsidies.

A NREDCAP official recently noted that the scheme is “a critical step in advancing renewable energy adoption in the state, ensuring that households directly benefit from the government’s commitment to solar power.”

Common Issues Faced by Applicants

IssueExplanation
Biometric or OTP delaysAuthentication errors can delay application approval.
Vendor mismatchNon-approved vendors result in subsidy ineligibility.
Incomplete documentationMissing Aadhaar or electricity account details often lead to rejections.
DISCOM inspection lagFinal commissioning sometimes stalls at the net metering stage.
Andhra Pradesh Government Scheme India Indian Government Services PM Surya Ghar Muft Bijli Yojana PM-SGMBY
Author
Pankaj Yadav

Leave a Comment